{"id":11532,"date":"2023-03-29T17:23:55","date_gmt":"2023-03-29T15:23:55","guid":{"rendered":"https:\/\/www.incide.it\/?p=11532"},"modified":"2023-06-18T12:48:16","modified_gmt":"2023-06-18T10:48:16","slug":"control-tower-cagliari-airport-new-acquisition","status":"publish","type":"post","link":"https:\/\/www.incide.it\/en\/control-tower-cagliari-airport-new-acquisition\/","title":{"rendered":"Acquisition Control Tower for Cagliari Airport, Italy"},"content":{"rendered":"<div data-block-id=\"block-e2554582-bd47-411d-ad48-6ff61fdeccc2\">Integrated contract for the <strong>design<\/strong> and <strong>construction<\/strong> of the <strong>new Cagliari Airport Control Tower<\/strong>.<\/div>\n<div class=\"ql-block\" data-block-id=\"block-137212b1-55a9-46df-b938-5e970a2ef80f\"><\/div>\n<div class=\"ql-block\" data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><a href=\"https:\/\/www.incide.it\/en\/\" target=\"_blank\" rel=\"noopener\">Incide Engineering<\/a> won the tender for the construction of the new control tower with annexed technical block building at Cagliari Elmas Airport &#8216;Mario Mameli&#8217;.<\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\">The integrated tender for the design and construction of the new Cagliari Airport Control Tower was won in association with the company Ser.Lu srl and the grouping of engineering companies consisting of MCI Infrasructures Engineering srl and Servizi Geotecnici S.a.s.; the contracting station is SOGAER Spa.<\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\">The project envisages the construction and adaptation of some support infrastructures for flight assistance in order to<strong> increase airport safety<\/strong> by conforming it both to the <strong>extension of the planned aircraft<\/strong> apron and to the<strong> increase in the number of movements<\/strong> according to the expected passenger traffic.<\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><span style=\"color: #ffffff;\">.<\/span><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\">\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><span style=\"color: #ffffff;\">.<\/span><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 0px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 0px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_02.jpg\" class=\"btx-gallery-media anmt-image-zoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_02-1067x800.jpg\" alt=\"torre controllo aeroporto cagliari\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_02-1067x800.jpg 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_02-911x683.jpg 911w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_02-683x512.jpg 683w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_02-455x341.jpg 455w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_02-267x200.jpg 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 0px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_01.jpg\" class=\"btx-gallery-media anmt-image-zoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_01-1067x800.jpg\" alt=\"torre controllo aeroporto cagliari\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_01-1067x800.jpg 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_01-911x683.jpg 911w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_01-683x512.jpg 683w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_01-455x341.jpg 455w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_01-267x200.jpg 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-3f780ad4-f9be-4b31-bf1d-9ab64fb600c4\">\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><span style=\"color: #ffffff;\">.<\/span><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<\/div>\n<div data-block-id=\"block-3f780ad4-f9be-4b31-bf1d-9ab64fb600c4\">The value of the works to which the services to be tendered refer is estimated at <strong>EUR 12 million<\/strong> and the project will be developed through Building Information Modeling (<strong>BIM<\/strong>), for the <strong>complete management<\/strong> of the design and construction phases.<\/div>\n<div data-block-id=\"block-3f780ad4-f9be-4b31-bf1d-9ab64fb600c4\"><\/div>\n<div data-block-id=\"block-3f780ad4-f9be-4b31-bf1d-9ab64fb600c4\">\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><span style=\"color: #ffffff;\">.<\/span><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\">\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><span style=\"color: #ffffff;\">.<\/span><\/div>\n<div data-block-id=\"block-573f7aa5-cabe-421f-aed8-1c1b0ce0571f\"><\/div>\n<\/div>\n<\/div>\n<div data-block-id=\"block-3f780ad4-f9be-4b31-bf1d-9ab64fb600c4\"><div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -2px;\" data-display=\"3\"><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_05.jpg\" class=\"btx-gallery-media anmt-image-zoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_05.jpg\" alt=\"torre controllo aeroporto cagliari\"  width=\"1200\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_05.jpg 1200w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_05-1024x683.jpg 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_05-768x512.jpg 768w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_05-512x341.jpg 512w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_05-300x200.jpg 300w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_04.jpg\" class=\"btx-gallery-media anmt-image-zoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_04.jpg\" alt=\"torre controllo aeroporto cagliari\"  width=\"1200\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_04.jpg 1200w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_04-1024x683.jpg 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_04-768x512.jpg 768w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_04-512x341.jpg 512w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_04-300x200.jpg 300w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_03.jpg\" class=\"btx-gallery-media anmt-image-zoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_03.jpg\" alt=\"torre controllo aeroporto cagliari\"  width=\"1200\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_03.jpg 1200w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_03-1024x683.jpg 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_03-768x512.jpg 768w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_03-512x341.jpg 512w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4_03-300x200.jpg 300w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div><\/div>\n<div data-block-id=\"block-3f780ad4-f9be-4b31-bf1d-9ab64fb600c4\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Incide wins the tender for the construction of the new Control Tower with Technical Block Building for Cagliari Airport. Discover the project.<\/p>\n","protected":false},"author":2,"featured_media":11506,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[168],"tags":[],"class_list":["post-11532","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-4-2.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/11532","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/comments?post=11532"}],"version-history":[{"count":10,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/11532\/revisions"}],"predecessor-version":[{"id":11716,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/11532\/revisions\/11716"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media\/11506"}],"wp:attachment":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media?parent=11532"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/categories?post=11532"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/tags?post=11532"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}