{"id":14757,"date":"2026-08-04T23:00:50","date_gmt":"2026-08-04T21:00:50","guid":{"rendered":"https:\/\/www.incide.it\/gara-centro-sportivo-tennis-magna-grecia-taranto\/"},"modified":"2026-08-04T23:37:24","modified_gmt":"2026-08-04T21:37:24","slug":"tender-sports-centre-tennis-taranto","status":"publish","type":"post","link":"https:\/\/www.incide.it\/en\/tender-sports-centre-tennis-taranto\/","title":{"rendered":"The Magna Grecia Sports Centre in Taranto takes the lead in preparations for the 20th Mediterranean Games in 2026"},"content":{"rendered":"<p>The Magna Grecia Sports Centre is a <b>particularly significant urban and sports regeneration project<\/b>, which radically transforms an existing facility into a modern sports centre of excellence.<\/p>\n<p>Incide Engineering has been awarded the contract for Engineering and Architectural Services for the project to <b>upgrade and redevelop the tennis sports centre<\/b>, ahead of the <a href=\"https:\/\/www.ta2026.com\/\">20th edition of the 2026 Mediterranean Games<\/a>: a major international event aimed at re-establishing Taranto as a centre of sporting excellence, building on its historic tradition in this field.<\/p>\n<p>The design consortium awarded the contract is a temporary joint venture (RTP) comprising <b>three leading firms<\/b> in the sports infrastructure sector: the lead partner is the Paolo Pettene &amp; Partners STP Architectural Practice, which is responsible for the architecture; Bolina Ingegneria is responsible for the structural engineering; and Incide Engineering is <b>responsible for the mechanical and electrical engineering design<\/b>, with Engineer Gianluca Vallerini acting as Project Manager.<\/p>\n<p>&nbsp;<\/p>\n<h2>The Magna Grecia Sports Centre (IT)<\/h2>\n<p>More than just a competitive sports facility, the new centre has been designed to deliver value to the local community, transforming a derelict area into a <b>hub for socialising and personal development for young people and families<\/b>, destined to endure well beyond the end of the Olympic Games. The <b>architectural heart<\/b> of the complex reinterprets the principles of Italian Rationalism in a contemporary key, harmoniously integrating spaces for athletes with areas dedicated to the public.<\/p>\n<p>Located in the Italia-Montegranaro district, the complex spans an entire city block. The project, valued at over <b>7 million euros<\/b>, involves the construction of <b>8 ITF-approved resin tennis courts<\/b>, including a centre court with stands capable of accommodating up to 1,500 spectators. The project is completed by a modern clubhouse, state-of-the-art changing rooms, a children\u2019s play area and green spaces featuring relaxation trails and a themed spray park.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -1.5px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_06-copia.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_06-copia.webp\" alt=\"\"  width=\"1200\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_06-copia.webp 1200w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_06-copia-1024x683.webp 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_06-copia-768x512.webp 768w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_06-copia-512x341.webp 512w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_06-copia-300x200.webp 300w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_07-copia.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_07-copia.webp\" alt=\"\"  width=\"1200\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_07-copia.webp 1200w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_07-copia-1024x683.webp 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_07-copia-768x512.webp 768w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_07-copia-512x341.webp 512w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_07-copia-300x200.webp 300w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<h2>The sustainable innovation project led by Incide Engineering<\/h2>\n<p><b>Incide Engineering<\/b> was responsible for the <b>detailed design of the mechanical and electrical systems<\/b> at RTP, and worked to ensure that, once the international event has concluded, the facility can be managed with <b>minimised operating costs<\/b>, offering the public modern spaces for sport and catering.<\/p>\n<p>The excellence of the work carried out is reflected in highly efficient <b>technological solutions<\/b>: here they are in detail.<\/p>\n<p>&nbsp;<\/p>\n<h3>NZEB and CAM Efficiency<\/h3>\n<ul>\n<li><b>The main building was designed to NZEB (Nearly Zero Energy Building) standards, ensuring energy performance exceeding legal limits, with a non-renewable energy performance index of just 3.76 kWh\/m\u00b2;<\/b><\/li>\n<li>every technical decision strictly adhered to the <b>Minimum Environmental Criteria (CAM).<\/b> The integration of a photovoltaic system on the roof of the technical block and the use of high-efficiency heat pumps have made it possible to achieve a <b>96.2 per cent share of energy from renewable sources<\/b>, well above the required minimum of 65 per cent.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3>Hydraulic and mechanical innovation<\/h3>\n<p>Incide has paid meticulous attention to water management and environmental comfort:<\/p>\n<ul>\n<li>a <b>rainwater harvesting system<\/b> has been designed, which feeds into a 15 m\u00b3 storage tank, allowing the water to be reused for watering green spaces. Furthermore, the car park is equipped with a dedicated tank for treating first-flush rainwater, complete with a sand trap and oil separator;<\/li>\n<li>the air-conditioning and heating systems have been designed to ensure <b>thermo-hygrometric comfort<\/b> through adaptive control of environmental conditions. The use of heat recovery units with 70 per cent thermal efficiency ensures efficient and healthy controlled mechanical ventilation.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3>Digitalisation and advanced electrical systems<\/h3>\n<p>The electrical and special systems designed by Incide represent the digital \u2018brain\u2019 of the complex:<\/p>\n<ul>\n<li>Incide has developed an <b>outdoor sports lighting system using RGB LED technology at the monumental entrance<\/b><\/li>\n<li><b>Wireless smart lighting:<\/b> the lighting system for the playing fields (capable of reaching <b>1,000 lx for television broadcasts<\/b>) is managed via wireless technology and Wi-Fi antennas, drastically reducing electrical cabling and enabling remote control via smartphone.<\/li>\n<li>The entire block is protected by a modern <b>CCTV<\/b> system for monitoring access points and the monumental entrance, supported by structured cabling comprising <b>Cat 6 and fibre optic cables.<\/b><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h3>Longevity of the project<\/h3>\n<p>Incide has drawn up an extremely detailed <b>maintenance plan<\/b> which includes:<\/p>\n<ul>\n<li><b>Operating and maintenance manuals<\/b> specific to each component.<\/li>\n<li>A <b>sub-programme of checks<\/b> to constantly monitor the qualitative and quantitative performance levels of the systems.<\/li>\n<li>Rigorous procedures for the <b>as-built<\/b> documentation and systematic testing (including in-factory testing) to ensure that every piece of installed machinery complies exactly with the design specifications.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<h2>Work in progress: the status of the construction sites<\/h2>\n<p>According to the latest updates from the site, work is proceeding at a rapid pace ahead of the Games\u2019 opening on 21 August. To date, the <b>tennis courts have been completed<\/b> and the <b>stands have already been erected.<\/b> The modern building that will house the clubhouse and changing rooms is <b>nearly complete in its main structure<\/b>. In this final phase, the teams are busy completing the interior finishes, the fencing, the sports equipment and the external walkways, as well as the play area located at the entrance.<\/p>\n<p>The site is therefore in the final stages of aesthetic and functional finishing, ready to be transformed from an international competition centre into a <b>multi-purpose sports centre<\/b> for the people of Taranto once the event has concluded.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -1.5px;\" data-display=\"3\"><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_02-copia-1.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_02-copia-1-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_02-copia-1-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_02-copia-1-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_02-copia-1-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_02-copia-1-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_02-copia-1-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_03-copia.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_03-copia-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_03-copia-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_03-copia-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_03-copia-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_03-copia-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_03-copia-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_04-copia.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_04-copia-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_04-copia-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_04-copia-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_04-copia-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_04-copia-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/SITO-WEB-Articolo-2_04-copia-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><div class=\"btx-gallery-caption\">Work in progress at the Magna Grecia Sports Centre<\/div><\/div>\n<p>&nbsp;<\/p>\n<p>Incide Engineering has built up solid experience in the <a title=\"Mercato ortofrutticolo di Camaiore | Italia\" href=\"https:\/\/www.incide.it\/project\/mercato-ortofrutticolo-di-camaiore-italia\/\" target=\"_blank\" rel=\"noopener\">sports infrastructure<\/a> sector, as demonstrated by the <a href=\"https:\/\/www.incide.it\/en\/sports-hall-rome-italy\/\" target=\"_blank\" rel=\"noopener\">CONI Sports Hall<\/a> in Rome and other international projects. This experience has enabled the company to become an integral part of a highly qualified team, strengthening its position as a <b>key player in the design of advanced technological systems<\/b> for major public works in the <a href=\"https:\/\/www.incide.it\/en\/projects\/#sport-spectacle\" target=\"_blank\" rel=\"noopener\">Sports &amp; Entertainment sector<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Incide wins the tender for the \u2018Magna Grecia\u2019 tennis sports centre in Taranto, with a \u20ac7.3 million project for the 2026 Mediterranean Games.<\/p>\n","protected":false},"author":40,"featured_media":17073,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[168],"tags":[],"class_list":["post-14757","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/www.incide.it\/wp-content\/uploads\/TEMPLATE-MAILCHIMP_08-2026SITO-WEB-Articolo-3-copia.webp","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/14757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/comments?post=14757"}],"version-history":[{"count":7,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/14757\/revisions"}],"predecessor-version":[{"id":17058,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/14757\/revisions\/17058"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media\/17073"}],"wp:attachment":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media?parent=14757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/categories?post=14757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/tags?post=14757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}