{"id":16506,"date":"2026-04-01T15:00:35","date_gmt":"2026-04-01T13:00:35","guid":{"rendered":"https:\/\/www.incide.it\/avanzamento-lavori-polo-scolastico-albaredo-adige\/"},"modified":"2026-04-13T11:52:58","modified_gmt":"2026-04-13T09:52:58","slug":"albaredo-adige-school-construction-site","status":"publish","type":"post","link":"https:\/\/www.incide.it\/en\/albaredo-adige-school-construction-site\/","title":{"rendered":"Progress of construction work on the new school complex in Albaredo d&#8217;Adige"},"content":{"rendered":"<div data-start-index=\"1494\">\n<p>The new <a href=\"https:\/\/www.incide.it\/en\/project\/vivaldi-simoni-school-complex-albaredo-italy\/\" target=\"_blank\" rel=\"noopener\">school complex in Albaredo d\u2019Adige<\/a> is set to become the beating heart and cultural hub of the community. Developed in <a href=\"https:\/\/www.incide.it\/en\/?p=11393\" target=\"_blank\" rel=\"noopener\">partnership with VGA<\/a>, Incide played a multidisciplinary role, overseeing the structural and services design, construction management, fire prevention and safety, all coordinated via an advanced BIM platform.<\/p>\n<p>This project, which has received PNRR funding for climate change mitigation, stands out as a model of <a href=\"https:\/\/www.incide.it\/en\/sustainable-civil-industrial-engineering\/\" target=\"_blank\" rel=\"noopener\">sustainability<\/a>: designed to minimise energy consumption and emissions, the building strictly complies with CAM requirements and exceeds <a href=\"https:\/\/www.incide.it\/en\/nzeb-buildings-meaning-projects\/\" target=\"_blank\" rel=\"noopener\">NZEB<\/a> standards, with primary energy demand 20% lower than legal requirements. <strong>Technical robustness<\/strong> is guaranteed by full compliance with the<strong> latest anti-seismic regulations<\/strong>, making the structure a benchmark for safety and technological innovation.<\/p>\n<p>Whilst the interiors are now complete and reveal the <strong>extraordinary quality of the spaces<\/strong> \u2014 such as the<strong> library\u2019s large \u2018agora\u2019<\/strong> with its tiered seating and the striking interplay of <strong>natural light<\/strong> provided by the <strong>skylights<\/strong> and the light well \u2014 the construction site is drawing to a close, with work now focusing on the outdoor areas and the sports court.<\/p>\n<p>The<strong> distinctive sheet metal cladding<\/strong> emphasises the identity of a building that stands as a<strong> new, cutting-edge civic hub<\/strong>, poised to redefine the surrounding urban context.<br \/>\nHere are the details of the work carried out, which demonstrate <strong>Incide\u2019s integrated approach and technical precision<\/strong>.<\/p>\n<\/div>\n<div data-start-index=\"1494\"><\/div>\n<div data-start-index=\"1494\"><div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -2px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_01.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_01-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_01-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_01-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_01-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_01-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_01-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_03.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_03-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_03-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_03-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_03-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_03-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_03-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div><\/div>\n<div data-start-index=\"1494\"><\/div>\n<div data-start-index=\"1494\">\n<p><strong>Architectural envelope and structural connections<\/strong>: Incide coordinated the completion of the architectural envelope and the complex structural integration of the connecting tunnel, ensuring the perfect integrity and iconic identity of a contemporary structure.<\/p>\n<p><strong>Basic plant and technological infrastructure<\/strong>: Incide supervised the integration of NZEB plant systems into the BIM platform, ensuring a 20% reduction in energy consumption through the commissioning of state-of-the-art air handling and radiant systems.<\/p>\n<p><strong>Interior finishes and quality of communal spaces<\/strong>: Incide directed the creation of interiors with high social value, maximising natural light and the use of sustainable materials in key spaces such as the library\u2019s large \u2018agora\u2019.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -2px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_02.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_02-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_02-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_02-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_02-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_02-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_02-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_04.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_04-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_04-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_04-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_04-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_04-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_04-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<p><strong>Safety, fire protection and compliance<\/strong>: Incide has ensured compliance with the highest standards of seismic safety and fire protection, coordinating EVAC performance tests and REI certifications to guarantee the building\u2019s full compliance and suitability for use.<\/p>\n<p><strong>Urban development and outdoor facilities<\/strong>: Incide has overseen the sustainable integration of the complex into the local area, implementing drainage infrastructure, green spaces and multi-purpose sports facilities designed for durability and community integration.<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-16501 size-large\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/\/Cantieri-SITO-WEB-Articolo-2_05-1024x683.webp\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_05-1024x683.webp 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_05-300x200.webp 300w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_05-768x512.webp 768w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_05-512x341.webp 512w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2_05.webp 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>The current state of the construction site for the new school complex in Albaredo d&#8217;Adige shows that the project is nearing completion, with the interiors almost finished and the focus now on the finishing touches and outdoor areas, ready to welcome the generations of tomorrow.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Albaredo School Complex: construction is in its final stages, with the interiors completed and work now focusing on the exteriors. A sustainable, earthquake-resistant project developed using BIM<\/p>\n","protected":false},"author":40,"featured_media":16487,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[168],"tags":[],"class_list":["post-16506","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-2.webp","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/comments?post=16506"}],"version-history":[{"count":5,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16506\/revisions"}],"predecessor-version":[{"id":16531,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16506\/revisions\/16531"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media\/16487"}],"wp:attachment":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media?parent=16506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/categories?post=16506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/tags?post=16506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}