{"id":16512,"date":"2026-04-01T19:17:35","date_gmt":"2026-04-01T17:17:35","guid":{"rendered":"https:\/\/www.incide.it\/villa-ferro-fidenza-construction-site\/"},"modified":"2026-04-13T11:49:05","modified_gmt":"2026-04-13T09:49:05","slug":"villa-ferro-fidenza-construction-site","status":"publish","type":"post","link":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/","title":{"rendered":"Villa Ferro school: work on the school in Fidenza is progressing"},"content":{"rendered":"<div data-start-index=\"1096\">The project for the <a href=\"https:\/\/www.incide.it\/en\/project\/school-complex-in-villa-ferro-fidenza-italy\/\" target=\"_blank\" rel=\"noopener\">new Villa Ferro School Complex in Fidenza<\/a> is one of the most significant examples of urban regeneration funded by the PNRR, transforming a dilapidated building into a school of architectural excellence: beautiful, functional, environmentally sustainable and energy-efficient thanks to green building practices.<br \/>\nThe result of a collaboration between <a href=\"https:\/\/www.vittoriograssi.it\/portfolio\/polo-scolastico-di-albaredo-adige\/\" target=\"_blank\" rel=\"noopener\">Vittorio Grassi Architects and Incide<\/a>, which was responsible for structural design, services engineering, construction management, fire safety and security, the building stands as a model of innovation for the future of public construction.<\/div>\n<div data-start-index=\"1096\"><\/div>\n<div data-start-index=\"1096\">The project stands out for its holistic approach to sustainability, incorporating solutions such as <strong>photovoltaic panels<\/strong>, an extensive <strong>green roof<\/strong> and<strong> rainwater harvesting systems<\/strong> to irrigate the large surrounding park. Every detail has been designed with the students\u2019 well-being and operational efficiency in mind: from the permeable concrete paths to the preservation of existing trees via a dedicated water retention basin.<\/div>\n<div data-start-index=\"1096\"><\/div>\n<div data-start-index=\"1096\">Inside, the building offers bright spaces thanks to floor-to-ceiling windows and <strong>skylights<\/strong>, ensuring maximum <strong>thermal and acoustic comfort<\/strong> through underfloor heating and high-performance glazing. The project is complemented by high-quality communal areas, such as an internal garden, a library, a canteen serving locally sourced meals, and a CONI-approved sports hall for Serie D, confirming Incide\u2019s commitment to delivering facilities that serve as genuine community hubs.<\/div>\n<div class=\"paragraph is-rich-chat-ui normal ng-star-inserted\" data-start-index=\"1096\">\n<p>The current status of the construction site for the New Villa Ferro School Complex in Fidenza marks a crucial stage in its completion, with the opening scheduled for 2026. Let\u2019s take a closer look at the progress being made on site, which is bringing the project ever closer to its ultimate goal: to provide the community with a<strong> modern and inclusive school<\/strong>, capable of meeting the needs of today\u2019s educational landscape and its young users.<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -2px;\" data-display=\"3\"><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_03.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_03-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_03-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_03-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_03-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_03-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_03-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_01.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_01-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_01-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_01-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_01-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_01-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_01-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_06.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_06-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_06-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_06-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_06-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_06-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_06-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<div class=\"paragraph is-rich-chat-ui normal ng-star-inserted\" data-start-index=\"510\"><strong>Architectural envelope and structural connections<\/strong>: Incide Engineering has successfully balanced structural complexity with environmental protection, optimising the integration between the building and its external surroundings through advanced waterproofing solutions, certified steelwork and sustainable drainage systems.<\/div>\n<div data-start-index=\"510\"><\/div>\n<div data-start-index=\"510\"><\/div>\n<div class=\"paragraph is-rich-chat-ui normal ng-star-inserted\" data-start-index=\"510\"><strong>Basic plant and technological infrastructure<\/strong>: Through integrated, state-of-the-art plant design, Incide Engineering has ensured high energy performance and native digital connectivity, successfully managing the implementation of the photovoltaic system and the fibre-optic network.<\/div>\n<div data-start-index=\"510\"><\/div>\n<div data-start-index=\"510\"><\/div>\n<div class=\"paragraph is-rich-chat-ui normal ng-star-inserted\" data-start-index=\"510\"><strong>Integrated comfort systems and finishes<\/strong>: Incide Engineering maximised occupant comfort by designing underfloor radiant systems and high-efficiency VRF solutions, whilst ensuring superior aesthetics thanks to the concealment of plant units perfectly integrated into the interior design.<\/div>\n<div data-start-index=\"510\"><\/div>\n<div data-start-index=\"510\"><\/div>\n<div class=\"paragraph is-rich-chat-ui normal ng-star-inserted\" data-start-index=\"510\"><strong>Project Management and Administrative Management<\/strong>: Incide Engineering ensured compliance with the rigorous PNRR standards and contractual timelines through rigorous project management, competently managing every phase of the structural testing, safety certifications and cost-effectiveness assessments.<\/div>\n<div data-start-index=\"510\"><\/div>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -2px;\" data-display=\"3\"><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_02.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_02-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_02-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_02-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_02-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_02-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_02-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_04.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_04-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_04-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_04-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_04-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_04-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_04-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-4\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_05.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_05-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_05-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_05-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_05-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_05-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3_05-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, (max-width:960px) 50vw, 33vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<p>In its role as structural and services designer, as well as project manager and safety coordinator, Incide ensured that key milestones were achieved, laying the foundations for a sustainable and efficient school building.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.<\/p>\n","protected":false},"author":40,"featured_media":16462,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[168],"tags":[],"class_list":["post-16512","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.3 - aioseo.com -->\n\t<meta name=\"description\" content=\"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.\" \/>\n\t<meta name=\"robots\" content=\"max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"Letizia Vignudelli\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.3\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Incide | Societ\u00e0 di ingegneria internazionale\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Villa Ferro school: work on the school in Fidenza is progressing\" \/>\n\t\t<meta property=\"og:description\" content=\"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-04-01T17:17:35+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-04-13T09:49:05+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Villa Ferro school: work on the school in Fidenza is progressing\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#article\",\"name\":\"Villa Ferro school: work on the school in Fidenza is progressing\",\"headline\":\"Villa Ferro school: work on the school in Fidenza is progressing\",\"author\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/author\\\/letizia\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.incide.it\\\/wp-content\\\/uploads\\\/Cantieri-SITO-WEB-Articolo-3.webp\",\"width\":1600,\"height\":1000,\"caption\":\"nuova scuola fidenza\"},\"datePublished\":\"2026-04-01T19:17:35+02:00\",\"dateModified\":\"2026-04-13T11:49:05+02:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#webpage\"},\"articleSection\":\"News, Optional\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.incide.it\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/category\\\/news-en\\\/#listItem\",\"name\":\"News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/category\\\/news-en\\\/#listItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/www.incide.it\\\/en\\\/category\\\/news-en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#listItem\",\"name\":\"Villa Ferro school: work on the school in Fidenza is progressing\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#listItem\",\"position\":3,\"name\":\"Villa Ferro school: work on the school in Fidenza is progressing\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/category\\\/news-en\\\/#listItem\",\"name\":\"News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/#organization\",\"name\":\"Incide\",\"description\":\"Societ\\u00e0 di ingegneria internazionale\",\"url\":\"https:\\\/\\\/www.incide.it\\\/en\\\/\",\"telephone\":\"+390498774150\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.incide.it\\\/wp-content\\\/uploads\\\/LOGO_INCIDE_2019_WEB-1.png\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#organizationLogo\",\"width\":300,\"height\":80},\"image\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/author\\\/letizia\\\/#author\",\"url\":\"https:\\\/\\\/www.incide.it\\\/en\\\/author\\\/letizia\\\/\",\"name\":\"Letizia Vignudelli\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#webpage\",\"url\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/\",\"name\":\"Villa Ferro school: work on the school in Fidenza is progressing\",\"description\":\"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/author\\\/letizia\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/author\\\/letizia\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.incide.it\\\/wp-content\\\/uploads\\\/Cantieri-SITO-WEB-Articolo-3.webp\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#mainImage\",\"width\":1600,\"height\":1000,\"caption\":\"nuova scuola fidenza\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/villa-ferro-fidenza-construction-site\\\/#mainImage\"},\"datePublished\":\"2026-04-01T19:17:35+02:00\",\"dateModified\":\"2026-04-13T11:49:05+02:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.incide.it\\\/en\\\/\",\"name\":\"Incide\",\"description\":\"Societ\\u00e0 di ingegneria internazionale\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.incide.it\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Villa Ferro school: work on the school in Fidenza is progressing","description":"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.","canonical_url":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/","robots":"max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#article","name":"Villa Ferro school: work on the school in Fidenza is progressing","headline":"Villa Ferro school: work on the school in Fidenza is progressing","author":{"@id":"https:\/\/www.incide.it\/en\/author\/letizia\/#author"},"publisher":{"@id":"https:\/\/www.incide.it\/en\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3.webp","width":1600,"height":1000,"caption":"nuova scuola fidenza"},"datePublished":"2026-04-01T19:17:35+02:00","dateModified":"2026-04-13T11:49:05+02:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#webpage"},"isPartOf":{"@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#webpage"},"articleSection":"News, Optional"},{"@type":"BreadcrumbList","@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.incide.it\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/www.incide.it\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.incide.it\/en\/category\/news-en\/#listItem","name":"News"}},{"@type":"ListItem","@id":"https:\/\/www.incide.it\/en\/category\/news-en\/#listItem","position":2,"name":"News","item":"https:\/\/www.incide.it\/en\/category\/news-en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#listItem","name":"Villa Ferro school: work on the school in Fidenza is progressing"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.incide.it\/en\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#listItem","position":3,"name":"Villa Ferro school: work on the school in Fidenza is progressing","previousItem":{"@type":"ListItem","@id":"https:\/\/www.incide.it\/en\/category\/news-en\/#listItem","name":"News"}}]},{"@type":"Organization","@id":"https:\/\/www.incide.it\/en\/#organization","name":"Incide","description":"Societ\u00e0 di ingegneria internazionale","url":"https:\/\/www.incide.it\/en\/","telephone":"+390498774150","logo":{"@type":"ImageObject","url":"https:\/\/www.incide.it\/wp-content\/uploads\/LOGO_INCIDE_2019_WEB-1.png","@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#organizationLogo","width":300,"height":80},"image":{"@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.incide.it\/en\/author\/letizia\/#author","url":"https:\/\/www.incide.it\/en\/author\/letizia\/","name":"Letizia Vignudelli"},{"@type":"WebPage","@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#webpage","url":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/","name":"Villa Ferro school: work on the school in Fidenza is progressing","description":"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.incide.it\/en\/#website"},"breadcrumb":{"@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#breadcrumblist"},"author":{"@id":"https:\/\/www.incide.it\/en\/author\/letizia\/#author"},"creator":{"@id":"https:\/\/www.incide.it\/en\/author\/letizia\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3.webp","@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#mainImage","width":1600,"height":1000,"caption":"nuova scuola fidenza"},"primaryImageOfPage":{"@id":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/#mainImage"},"datePublished":"2026-04-01T19:17:35+02:00","dateModified":"2026-04-13T11:49:05+02:00"},{"@type":"WebSite","@id":"https:\/\/www.incide.it\/en\/#website","url":"https:\/\/www.incide.it\/en\/","name":"Incide","description":"Societ\u00e0 di ingegneria internazionale","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.incide.it\/en\/#organization"}}]},"og:locale":"en_US","og:site_name":"Incide | Societ\u00e0 di ingegneria internazionale","og:type":"article","og:title":"Villa Ferro school: work on the school in Fidenza is progressing","og:description":"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.","og:url":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/","article:published_time":"2026-04-01T17:17:35+00:00","article:modified_time":"2026-04-13T09:49:05+00:00","twitter:card":"summary","twitter:title":"Villa Ferro school: work on the school in Fidenza is progressing","twitter:description":"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school."},"aioseo_meta_data":{"post_id":"16512","title":"Villa Ferro school: work on the school in Fidenza is progressing","description":"Find out how the construction work is progressing, transforming the Fidenza-Parma School Complex into a sustainable, functional, inclusive and modern school.","keywords":null,"keyphrases":{"focus":[],"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"Article","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-04-06 18:27:05","updated":"2026-10-17 11:15:57","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.incide.it\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.incide.it\/en\/category\/news-en\/\" title=\"News\">News<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tVilla Ferro school: work on the school in Fidenza is progressing\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.incide.it\/en\/"},{"label":"News","link":"https:\/\/www.incide.it\/en\/category\/news-en\/"},{"label":"Villa Ferro school: work on the school in Fidenza is progressing","link":"https:\/\/www.incide.it\/en\/villa-ferro-fidenza-construction-site\/"}],"jetpack_featured_media_url":"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-3.webp","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/comments?post=16512"}],"version-history":[{"count":4,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16512\/revisions"}],"predecessor-version":[{"id":16528,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16512\/revisions\/16528"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media\/16462"}],"wp:attachment":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media?parent=16512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/categories?post=16512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/tags?post=16512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}