{"id":16517,"date":"2026-04-01T22:00:56","date_gmt":"2026-04-01T20:00:56","guid":{"rendered":"https:\/\/www.incide.it\/avanzamento-lavori-padiglione-4-ospedale-ai-colli\/"},"modified":"2026-04-13T11:51:03","modified_gmt":"2026-04-13T09:51:03","slug":"progress-on-work-pavilion-4-ai-colli-hospital","status":"publish","type":"post","link":"https:\/\/www.incide.it\/en\/progress-on-work-pavilion-4-ai-colli-hospital\/","title":{"rendered":"Ward 4, Ai Colli Hospital, Padua: work in progress"},"content":{"rendered":"<p>Incide Engineering\u2019s project on <a href=\"https:\/\/www.incide.it\/en\/project\/hall-4-ai-colli-hospital-padua-italy\/\" target=\"_blank\" rel=\"noopener\">Pavilion 4<\/a> is a complex architectural regeneration scheme that combines the preservation of a listed historic building with the latest seismic safety requirements. In a building dating back to the early 20th century, the ability to strike a balance between conservation and innovation is crucial, involving the implementation of state-of-the-art structural reinforcements and flexible technical solutions.<\/p>\n<p>The current works see Incide taking the lead in a wide range of activities: <a href=\"https:\/\/www.incide.it\/en\/consultancy\/\">project management<\/a>, <a href=\"https:\/\/www.incide.it\/en\/facades-architecture\/\" target=\"_blank\" rel=\"noopener\">architecture<\/a>, <a href=\"https:\/\/www.incide.it\/en\/structural-engineering\/\" target=\"_blank\" rel=\"noopener\">structural engineering<\/a>, <a href=\"https:\/\/www.incide.it\/en\/engineering\/\" target=\"_blank\" rel=\"noopener\">civil engineering<\/a>, <a href=\"https:\/\/www.incide.it\/en\/electrical-and-mechanical-engineering\/\" target=\"_blank\" rel=\"noopener\">electrical systems, mechanical systems<\/a>,<a href=\"https:\/\/www.incide.it\/en\/fire-safety-engineering\/\" target=\"_blank\" rel=\"noopener\"> fire protection<\/a>, <a href=\"https:\/\/www.incide.it\/en\/building-information-modelling\/\" target=\"_blank\" rel=\"noopener\">BIM<\/a> and <strong>safety<\/strong>.<\/p>\n<p>For local residents, patients and their families, this project translates into a safer and more accessible environment.<\/p>\n<p>Here is a detailed overview of the progress on site, which is bringing the project ever closer to its ultimate goal: to return to the community a modern and inclusive Mental Health Centre (MHC), capable of unifying services within a single, cohesive area dedicated to therapy and rehabilitation.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -2px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_01.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_01-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_01-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_01-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_01-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_01-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_01-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_03.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_03-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_03-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_03-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_03-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_03-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_03-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<div class=\"paragraph is-rich-chat-ui heading3 ng-star-inserted\" role=\"heading\" data-start-index=\"495\" aria-level=\"3\">\n<p><strong>Architectural envelope and structural connections<\/strong>: Incide Engineering is overseeing the regeneration of listed heritage through cutting-edge seismic retrofitting solutions and dynamic management of technical variations, ensuring a perfect balance between new structural requirements and the rigorous preservation of existing historic features.<\/p>\n<p><strong>Basic plant and technological infrastructure<\/strong>: The firm is coordinating the integration of complex mechanical systems and high-efficiency plant rooms, optimising energy performance and system resilience to meet the specific clinical requirements of a modern Mental Health Centre.<\/p>\n<p><strong>Electrical systems, digitalisation and healthcare security<\/strong>: Incide Engineering oversaw the implementation of an advanced fibre-optic digital infrastructure and specialised security and control systems, ensuring maximum operational continuity and high standards of protection for patients and healthcare staff.<\/p>\n<p><strong>Technical collaboration and process management<\/strong>: Through fruitful collaboration with the Sole Project Manager, Incide Engineering fostered constant technical dialogue, enabling the definition of shared architectural solutions and the effective management of the execution dynamics typical of the refurbishment of existing buildings.<\/p>\n<p><strong>Social value and a people-centred approach<\/strong>: The project provides the community with an inclusive, technologically advanced care facility that successfully combines the building\u2019s historic prestige with a safe and dignified therapeutic environment, focused on the collective well-being of the community.<\/p>\n<\/div>\n<div class=\"btx-item btx-image btx-center-position\"><div class=\"btx-image-container\"><div class=\"btx-media-wrapper modal-image\" style=\"max-width:100%;\"><a class=\"btx-media-wrapper-inner\" href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-ospedale-colli-padiglione-4.webp\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-ospedale-colli-padiglione-4-1024x683.webp\" alt=\"\"  width=\"1024\" height=\"683\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-ospedale-colli-padiglione-4-1024x683.webp 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-ospedale-colli-padiglione-4-768x512.webp 768w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-ospedale-colli-padiglione-4-512x341.webp 512w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-ospedale-colli-padiglione-4-300x200.webp 300w\" sizes=\"auto, (max-width:1024px) 100vw, 1024px\" \/><\/a><\/div><\/div><\/div>\n<p>The current progress of works at Pavilion 4 of the Ospedale ai Colli demonstrates the effectiveness of an <strong>approach that combines high technical specialisation with dynamic site management<\/strong>. Within the context of the regeneration of a listed historic building, a fruitful collaboration has been established with the Sole Project Manager (RUP), aimed at refining the architectural definition of the project. The synergy between Incide Engineering\u2019s Project Management team and the contracting authority has enabled <strong>operations to be optimised<\/strong>.<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -2px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_05.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_05-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_05-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_05-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_05-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_05-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_05-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 2px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_04.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_04-1067x800.webp\" alt=\"\"  width=\"1067\" height=\"800\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_04-1067x800.webp 1067w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_04-911x683.webp 911w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_04-683x512.webp 683w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_04-455x341.webp 455w, https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-SITO-WEB-Articolo-1_04-267x200.webp 267w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>The result is a building that meets the<strong> highest standards of seismic safety<\/strong> and <strong>technological innovation<\/strong>, whilst ensuring the utmost<strong> protection of the original architectural heritage<\/strong>, positioning Incide as a strategic partner for the construction of the healthcare infrastructure of the future.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Find out about the progress of the construction work on the new Pavilion 4 at Ai Colli Hospital: from building and structural works to the installations and digitalisation.<\/p>\n","protected":false},"author":40,"featured_media":16441,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[168],"tags":[],"class_list":["post-16517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/www.incide.it\/wp-content\/uploads\/Cantieri-Sito-WEB-Articolo-1.webp","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/comments?post=16517"}],"version-history":[{"count":4,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16517\/revisions"}],"predecessor-version":[{"id":16530,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16517\/revisions\/16530"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media\/16441"}],"wp:attachment":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media?parent=16517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/categories?post=16517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/tags?post=16517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}