{"id":16683,"date":"2026-05-04T17:43:45","date_gmt":"2026-05-04T15:43:45","guid":{"rendered":"https:\/\/www.incide.it\/case-study-hangar-aeroporto-ciampino\/"},"modified":"2026-05-10T17:39:44","modified_gmt":"2026-05-10T15:39:44","slug":"case-study-hangar-rome-airport","status":"publish","type":"post","link":"https:\/\/www.incide.it\/en\/case-study-hangar-rome-airport\/","title":{"rendered":"PG109 Hangar at Ciampino: LEED Gold strategy and high performance"},"content":{"rendered":"<p>In the airport sector, every infrastructure investment is subject to challenging objectives such as <strong>reducing operating costs<\/strong>, ensuring<strong> service continuity<\/strong>, complying with increasingly stringent <strong>environmental standards<\/strong>, and maintaining high levels of <strong>safety<\/strong>.<\/p>\n<p>In this context, the <strong>replacement of obsolete facilities<\/strong> also has an impact on the operator\u2019s reputation and long-term sustainability.<\/p>\n<p>The <a href=\"https:\/\/www.incide.it\/en\/project\/hangar-pg109-ciampino-airport-rome-italy\/\" target=\"_blank\" rel=\"noopener\">PG109 Hangar project at Ciampino Airport<\/a> stems precisely from this need: to transform an infrastructure that is no longer adequate into an integrated system capable of supporting advanced general aviation with energy and management standards aligned with international benchmarks.<\/p>\n<p>&nbsp;<\/p>\n<h2>An infrastructure designed for modern general aviation<\/h2>\n<p>The project involved the complete <strong>replacement<\/strong> of an existing hangar, with the aim of bringing all operational functions \u2013 <strong>aircraft storage, maintenance, offices and reception areas<\/strong> \u2013 under one roof.<\/p>\n<p>The structure, covering a total area of approximately 3,630 m\u00b2 and with a clear height of over 11 metres, is designed to accommodate large aircraft, whilst the office and workshop block is seamlessly integrated, facilitating the smooth running of operations.<\/p>\n<p>The steel structure allows for large spans with a high degree of internal spatial freedom. This approach is also reflected in the large 43.7-metre sliding door, made of translucent multi-wall polycarbonate. The ability to bring natural light deep into the hangar has a direct impact on energy consumption.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -1.5px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-3.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-3-733x550.webp\" alt=\"\"  width=\"733\" height=\"550\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-3-733x550.webp 733w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-3-704x528.webp 704w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-3-469x352.webp 469w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-3-275x206.webp 275w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-4.webp\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-4-733x550.webp\" alt=\"\"  width=\"733\" height=\"550\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-4-733x550.webp 733w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-4-704x528.webp 704w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-4-469x352.webp 469w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-4-275x206.webp 275w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<h2>Structure, systems and cladding: a single, high-performance system<\/h2>\n<p>In the PG109 project, <a href=\"https:\/\/www.incide.it\/en\/facades-architecture\/\" target=\"_blank\" rel=\"noopener\">architecture<\/a>, <a href=\"https:\/\/www.incide.it\/en\/structural-engineering\/\" target=\"_blank\" rel=\"noopener\">structure<\/a> and <a href=\"https:\/\/www.incide.it\/en\/electrical-and-mechanical-engineering\/\" target=\"_blank\" rel=\"noopener\">systems<\/a> are not treated as separate elements. The entire building has been conceived as a single system, in which every component contributes to the overall performance.<\/p>\n<p>The S355<a href=\"https:\/\/www.incide.it\/en\/structural-engineering-projects\/\" target=\"_blank\" rel=\"noopener\"> steel structure<\/a>, featuring truss beams with spans of up to 47 metres, interacts with a high-performance building envelope. The hangar\u2019s curtain walls use <strong>insulated sandwich panels<\/strong>, whilst the office block features ventilated facades, improving thermal and hygrometric performance and indoor comfort.<\/p>\n<p>The <strong>roof<\/strong> is also an active part of the energy strategy: the high-reflectance PVC cladding helps to limit the heat island effect, reducing the summer thermal load and improving overall efficiency.<\/p>\n<p>Inside, the choice of building services follows the same integrated logic. The hangar uses a <strong>low-temperature underfloor radiant system<\/strong>, particularly effective in high-ceilinged spaces, whilst the offices are air-conditioned using air-source <strong>heat pumps with fan coil units<\/strong> and air handling units. The entire building is<strong> 100% electric<\/strong>, completely eliminating the use of fossil fuels.<\/p>\n<div class=\"btx-item btx-image btx-center-position\"><div class=\"btx-image-container\"><div class=\"btx-media-wrapper modal-image\" style=\"max-width:100%;\"><a class=\"btx-media-wrapper-inner\" href=\"https:\/\/www.incide.it\/wp-content\/uploads\/ADR02-GIF-PORTALE-LD.webp\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/ADR02-GIF-PORTALE-LD.webp\" alt=\"\"  width=\"1200\" height=\"588\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/ADR02-GIF-PORTALE-LD.webp 1200w\" sizes=\"auto, (max-width:1200px) 100vw, 1200px\" \/><\/a><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<h2>Sustainability certified to LEED Gold and CAM standards<\/h2>\n<p>Sustainability must be quantifiable and certifiable: the project was developed with the aim of achieving <a href=\"https:\/\/www.incide.it\/en\/sustainability-leed-certification\/\" target=\"_blank\" rel=\"noopener\">LEED Gold certification<\/a>, incorporating the requirements of the Minimum Environmental Criteria (CAM) at every stage, from design to construction.<\/p>\n<p><strong>Energy performance<\/strong> was simulated through dynamic modelling of the entire building-services system, resulting in <strong>energy cost savings of 18.84%<\/strong> compared to a reference building. The <strong>rooftop photovoltaic system<\/strong> also contributes to this, covering approximately 13% of the building\u2019s energy needs.<\/p>\n<p><strong>Water management<\/strong> was addressed with the same systemic approach. Rainwater is collected and reused for non-potable purposes, whilst low-flow fixtures and smart irrigation systems further reduce consumption.<\/p>\n<p>The <strong>choice of materials<\/strong> also follows strict criteria: a significant proportion is derived from recycled content, and the construction site is organised to recover most of the waste produced. In this way, sustainability encompasses the entire construction and life cycle of the building.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16662 aligncenter\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-5.webp\" alt=\"\" width=\"1059\" height=\"519\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-5.webp 1200w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-5-300x147.webp 300w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-5-1024x502.webp 1024w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-5-768x376.webp 768w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-5-512x251.webp 512w\" sizes=\"auto, (max-width: 1059px) 100vw, 1059px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2>Fire safety: designing for real-life scenarios<\/h2>\n<p>In an airport context, <a href=\"https:\/\/www.incide.it\/en\/fire-safety-engineering\/\" target=\"_blank\" rel=\"noopener\">fire safety<\/a> is more complex than in other settings: the <strong>presence of aircraft with residual fuel<\/strong> necessitates high levels of protection and<strong> specialised design solutions<\/strong>.<\/p>\n<p>In the case of Hangar PG109, this translates into a strategy that combines structural fire resistance, active systems and smoke management. The <strong>load-bearing structures are protected<\/strong> to ensure adequate fire resistance ratings, whilst the building is equipped with <strong>automatic detection systems, hydrants and natural smoke and heat exhaust vents<\/strong>. The latter also contribute to <strong>natural ventilation<\/strong>, improving indoor comfort during the warmer months. It is a concrete example of how a technical choice can simultaneously meet safety and environmental quality requirements.<\/p>\n<p>&nbsp;<\/p>\n<h2>Advanced commissioning: sustained high performance over time<\/h2>\n<p>One of the most important aspects of a complex infrastructure is its ability to maintain the performance levels specified in the design phase over time.<\/p>\n<p>For this reason, the PG109 project incorporates an<strong> Enhanced Commissioning process<\/strong>, which extends the checks well beyond the final acceptance test. The HVAC systems, the building envelope, the lighting systems and renewable energy sources are tested using specific procedures, including balancing and functional tests. The process continues for up to ten months after the building is occupied, including seasonal checks.<\/p>\n<p>For the client, this means having the <strong>certainty that the building actually performs as expected<\/strong>, avoiding discrepancies between the design and actual use.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -1px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-6.jpg\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-6-413x550.jpg\" alt=\"\"  width=\"413\" height=\"550\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-6-413x550.jpg 413w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-6-396x528.jpg 396w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-6-264x352.jpg 264w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-6-155x206.jpg 155w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-2.jpg\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-2-797x1063.jpg\" alt=\"\"  width=\"797\" height=\"1063\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-2-797x1063.jpg 797w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-2-732x976.jpg 732w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-2-768x1024.jpg 768w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-2-512x683.jpg 512w, https:\/\/www.incide.it\/wp-content\/uploads\/PG109-hangar-design-leed-incide-2-214x285.jpg 214w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<h2>BIM and managing design complexity<\/h2>\n<p><strong>Managing a project with this level of integration<\/strong> requires tools capable of <strong>coordinating different disciplines<\/strong> without any loss of information. The use of <a href=\"https:\/\/www.incide.it\/en\/building-information-modelling\/\" target=\"_blank\" rel=\"noopener\">BIM methodology<\/a> has enabled the creation of a comprehensive digital model, shared amongst all the disciplines involved: architecture, structural engineering and MEP.<\/p>\n<p>Energy simulations and finite element structural models were developed from the same information environment, ensuring a <strong>common basis<\/strong> for all decisions. At the same time, the model supported <strong>cost estimation and financial control activities<\/strong>, reducing margins of error and inefficiencies.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"btx-item js-item-gallery btx-gallery btx-gallery--carousel\" data-popup=\"true\"><div class=\"btx-gallery-content\" style=\"margin:0 -1.5px;\" data-display=\"2\"><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino9.jpg\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino9-733x550.jpg\" alt=\"\"  width=\"733\" height=\"550\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino9-733x550.jpg 733w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino9-704x528.jpg 704w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino9-469x352.jpg 469w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino9-275x206.jpg 275w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><div class=\"btx-gallery-item btx-col-6\" style=\"padding:0 1.5px;\"><div class=\"btx-gallery-body\" ><a href=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino8-copia.jpg\" class=\"btx-gallery-media anmt-image-slowzoom\"  title=\"\"><div class=\"btx-media-wrapper\" ><div class=\"btx-media-wrapper-inner\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino8-copia-733x550.jpg\" alt=\"\"  width=\"733\" height=\"550\" srcset=\"https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino8-copia-733x550.jpg 733w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino8-copia-704x528.jpg 704w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino8-copia-469x352.jpg 469w, https:\/\/www.incide.it\/wp-content\/uploads\/Incide-Hangar-PG109-Aeroporto-Ciampino8-copia-275x206.jpg 275w\" sizes=\"auto, (max-width:767px) 100vw, 50vw\" \/><\/div><\/div><\/a><\/div><\/div><\/div><\/div>\n<p>&nbsp;<\/p>\n<h2>Durability and lifecycle management<\/h2>\n<p>For airport infrastructure, the quality of a design is also measured by its ability to keep performance and costs under control over time.<\/p>\n<p>In PG109, this translates into choices focused on <strong>maintainability<\/strong>: durable materials, high-performance industrial finishes, and construction solutions that facilitate access and maintenance work.<\/p>\n<p>To support these choices, <strong>a structured maintenance plan has been developed<\/strong>, with precise guidelines on inspections and scheduled maintenance. The aim is to ensure a long service life whilst maintaining high operational standards.<\/p>\n<p>The transformation of the PG109 area demonstrates how a well-structured project can have an impact on multiple levels: <strong>operations, sustainability, safety and long-term management<\/strong>: an example of integration between <strong>multidisciplinary engineering, BIM and advanced environmental standards<\/strong>.<\/p>\n<p>This approach reflects <strong>Incide Engineering<\/strong>\u2019s expertise in the <a href=\"https:\/\/www.incide.it\/en\/expertise-in-aviation-market\/\" target=\"_blank\" rel=\"noopener\">aviation sector<\/a>, gained through collaborations with a<strong>irport operators, design firms, industrial groups and international contractors<\/strong>. From design to construction, Incide manages the entire project lifecycle, ensuring control and quality. This expertise is demonstrated by projects such as the <a href=\"https:\/\/www.incide.it\/en\/project\/qatar-airways-maintenance-hangar-doha-airport\/\" target=\"_blank\" rel=\"noopener\">Qatar Airways Maintenance Hangar in Doha<\/a>, designed to accommodate up to eight aircraft, where technical complexity and operational performance are effectively integrated into the design.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Discover the aviation project featuring a steel structure, electrical systems, a LEED Gold strategy and advanced commissioning to ensure efficiency and operational continuity<\/p>\n","protected":false},"author":40,"featured_media":16625,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[168],"tags":[],"class_list":["post-16683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"aioseo_notices":[],"jetpack_featured_media_url":"https:\/\/www.incide.it\/wp-content\/uploads\/Sito-WEB-04-2026-Articolo-1.webp","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/users\/40"}],"replies":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/comments?post=16683"}],"version-history":[{"count":5,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16683\/revisions"}],"predecessor-version":[{"id":16698,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/posts\/16683\/revisions\/16698"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media\/16625"}],"wp:attachment":[{"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/media?parent=16683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/categories?post=16683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.incide.it\/en\/wp-json\/wp\/v2\/tags?post=16683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}