A project consisting in the enlargement of an existing production plant for the fiber carbon Fueselage of the Boeing 787 Aircraft. A New Clean Room of 15000 sqm, an Office Building of 3000 sqm and a new heating and Cooling Systems were installed.
Incide engineering provided services for detail design and construction management for three story Office Building, of about 3000 sqm, built in the AleniaAermacchi Plant in Grottaglie Taranto.
The building has a steel structure with composite floors, and external walls with ventilated facades.
Incide engineering provided services for detail design and construction management for three story Office Building, of about 3000 sqm, built in the AleniaAermacchi Plant in Grottaglie Taranto.
The building has a steel structure with composite floors, and external walls with ventilated facades.