Incide Engineering was involved by Cefla s.c. to provide the design of a standard modular building to be used as a container for General Electric's J920 electric generator.
A model designed in the BIM platform was proposed, consisting of three standardised modules designed for mutual connection, so as to be able to contain different situations in which multi-functional auxiliary spaces or more than one generator were needed.
For the final project, it was then chosen to design a standardised building that met the particular structural requirements in compliance with the regulations for the use of an industrial plant.
A model designed in the BIM platform was proposed, consisting of three standardised modules designed for mutual connection, so as to be able to contain different situations in which multi-functional auxiliary spaces or more than one generator were needed.
For the final project, it was then chosen to design a standardised building that met the particular structural requirements in compliance with the regulations for the use of an industrial plant.