Incide participated in the tender for the design of the new Turin stadium, setting up a project for two UEFA football fields, one for Torino Football Club training and the other for the team's matches. The main field will be heated by an undergrass heating system.
On the main side there will be a covered grandstand capable to host up to 2,000 spectators, with a pressroom, commentary room, toilets and disabled access via an elevator built inside the building.
Under the grandstand there will be a covered parking for the players of each team, and a basement floor that will host changing rooms, therapy rooms, referee areas and an infirmary