The project consisted in the construction of a new water plant called: “ Raf A1 at Ras Abu Fontas”, owned Qatar Electricity and Water Co, erection site Ras Abou Fontas, Qatar.
The project included two main items and namely: one boilers installation inclusive of ancillary structures (stairs), platforms, air ducts, tacks(65 m total height) and one deaerator.
Incide Engineering produced, for STF spa, the structural project of the various items, including the air ducts, deaerator and stacks. It also provided detailed studies for stack assembly, sea transportation of boilers and specific boiler internal parts.
The project included two main items and namely: one boilers installation inclusive of ancillary structures (stairs), platforms, air ducts, tacks(65 m total height) and one deaerator.
Incide Engineering produced, for STF spa, the structural project of the various items, including the air ducts, deaerator and stacks. It also provided detailed studies for stack assembly, sea transportation of boilers and specific boiler internal parts.