Sesto S. Giovanni hospital

Adjustment by Incide Engineering to the fire prevention regulations for the "Città di Sesto San Giovanni" hospital, in compliance with fire prevention principles both in terms of materials and finishes adopted and the compartments and systems.
Having acquired the general data and the conformation of the areas and premises to be protected, the applicable regulatory references, the characteristics of the interventions and the design criteria were identified. It was decided to act on the compartments delimited by predetermined and organised fire resistance construction elements and operated with wall openings or on existing windows with sufficient surface to ensure the constant air exchange required by law.
YEAR:
2019
OWNER:
Lombardy Region
CLIENT:
ASST Nord Milano
ARCHITECT:
-
LOCATION:
Milan - Italy
MARKET:
Health
SERVICES:
Electrical engineering - Mechanical engineering - Fire prevention engineering