Antonio Vivaldi & Renato Simoni School Complex - Albaredo d’Adige | Italy

Following the awarding of a competition in partnership with the VGA architecture studio, Incide carried out the tasks of structural and plant design, works management, fire prevention and safety for the new A. Vivaldi (primary school) and R. Simoni (secondary school) school complex in Albaredo D'Adige.
The project, recipient of PNRR funding for the mitigation of climate change, was designed and built to minimise energy consumption and carbon emissions throughout its entire life cycle; the construction solutions, materials and components used guarantee compliance with the CAM in force, while the global primary non-renewable energy demand is 20% lower than that resulting from the requirements for a nearly zero energy building (NZEB). From a structural point of view, the latest regulations in accordance with current earthquake-proof design standards have been complied with. All disciplines were designed using BIM platform.
YEAR:
2023
OWNER:
Comune di Albaredo d’Adige (VR)
CLIENT:
Comune di Albaredo d’Adige (VR)
ARCHITECT:
Vittorio Grassi Architetto
LOCATION:
Albaredo D’Adige - Italia
MARKET:
Infrastructures
SERVICES:
Structural engineering - Civil engineering - Electrical engineering - Mechanical engineering - Fire protection engineering - Bim & multidiscplipinary coordination - Construction management - Safety coordination - Commissioning