Incide Engineering carried out the tasks of structural and plant design, works management, fire-fighting and safety for the New Villa Ferro School Complex in Fidenza (PR).
Incide carried out the tasks of structural and plant design, works management, fire prevention and safety. The project was designed and built to minimise energy consumption and carbon emissions throughout its entire life cycle; the construction solutions, materials and components used guarantee compliance with the CAM in force, while the global primary non-renewable energy demand is 20% lower than that resulting from the requirements for a nearly zero energy building (NZEB). From a structural point of view, the latest regulations in accordance with current earthquake-proof design standards have been complied with. All disciplines were designed using BIM platform.
Following the awarding of the tender, Incide, in partnership with Vittorio Grassi Architetto, developed the service of executive design and safety coordination during the design phase for the adaptation of the 113th Military Air Force Base in Portogruaro (VE).
Incide Engineering was entrusted with the Technical-Economic Feasibility, Definitive and Executive design, including the Safety and Coordination Plan, for the construction of the new APP Radar Tower and annexed building for the control room and technical rooms at the Genoa A.C.